The New Colorado Model Low Energy and Carbon Code (MLECC) establishes rigorous performance benchmarks for building envelopes, focusing on high-performance insulation and enhanced air sealing to move homes toward net-zero energy readiness.
Insulation Standards
Insulation requirements vary by jurisdiction, with several major areas adopting the most stringent standards:
- Denver, Centennial, and Unincorporated Arapahoe County: These jurisdictions mandate R-49 attic insulation and R-20 wall insulation. To meet the R-20 wall requirement and minimize thermal bridging, these codes typically require the use of continuous insulation, such as polyiso.
- Colorado Springs: Currently maintains slightly lower thresholds, requiring R-38 attic insulation and R-19 wall insulation.
Air Sealing and Building Envelope Requirements
The MLECC introduces several measures to guarantee airtightness and thermal efficiency:
- Enhanced Air Sealing: The code requires advanced air sealing techniques designed to dramatically reduce thermal transfer.
- Duct Leakage Testing: Compliance involves mandatory testing of ductwork to ensure minimal energy loss through the HVAC system.
- High-Performance Windows: To support the building envelope, windows must meet strict thresholds by July 2026. In most jurisdictions (except Colorado Springs), this includes a U-value of 0.30 or lower and a Solar Heat Gain Coefficient (SHGC) of 0.25 or lower.
- Electric-Ready Provisions: New standards include requirements to make homes “electric-ready” to facilitate future electrification and carbon reduction goals.
Related FAQs
-
What are the Benefits of Design Build Remodeling vs Traditional Contracting?
Read More »: What are the Benefits of Design Build Remodeling vs Traditional Contracting?The design build remodeling model offers several significant advantages over the traditional “design-bid-build” contracting method by consolidating architectural design and construction under a single contract. The primary benefits include: Related FAQs
-
What is the Average Timeline for an End-to-end Design-build Project?
Read More »: What is the Average Timeline for an End-to-end Design-build Project?The average timeline for an end-to-end design-build project varies depending on the specific type of renovation and the complexity of the scope. Because the design-build model uses integrated project delivery, design and construction tasks can overlap, which generally shortens the…
-
Should I be Concerned if I Notice Stair-step Cracks Appearing near Doors and Windows?
Read More »: Should I be Concerned if I Notice Stair-step Cracks Appearing near Doors and Windows?Yes, noticing stair-step cracks near doors and windows is a significant reason for concern as these areas are natural weak points in a building’s structure. While some cracking can be cosmetic, specific patterns in these locations often signal differential settlement—the…
-
What is the Typical Process for Repairing Stair-step Cracks in a Home’s Foundation?
Read More »: What is the Typical Process for Repairing Stair-step Cracks in a Home’s Foundation?The typical process for repairing stair-step cracks involves a transition from home monitoring to professional structural intervention. Because these cracks are symptoms of underlying issues like foundation settlement or expansive soil, the repair process focuses on stabilizing the home’s structure…
-
Are Stair-step Cracks in my Home’s Foundation a Sign of Serious Structural Damage?
Read More »: Are Stair-step Cracks in my Home’s Foundation a Sign of Serious Structural Damage?Stair-step cracks are often a telltale sign of structural movement, but their severity depends on their size, stability, and accompanying symptoms. While some minor cracking can be cosmetic, the stair-step pattern typically indicates that the foundation is experiencing differential settlement…
