About us

The construction industry is experiencing a dynamic and transformative period of growth.

  • Home
  • FAQs
  • How should I Prepare my Home for Window Installation Day?
/
/
/
/
/
/
/
/
/

To ensure a smooth and efficient project, home preparation should begin 1 to 2 days before the crew arrives. Preparation is divided into indoor and outdoor tasks:

Indoor Preparations

  1. Clear Access: Move all furniture, including couches, tables, and chairs, at least three feet away from every window being replaced.
  2. Remove Window Treatments: Take down all curtains, drapes, blinds, and valances. These should be stored in a separate room or closet until the project is finished.
  3. Clear Sills and Surfaces: Remove picture frames, potted plants, lamps, and fragile decorations from window sills. Secure small valuables in a safe location.
  4. Protect Flooring: While contractors typically provide heavy-duty drop cloths, notify them in advance if you have antique rugs or delicate flooring that requires extra protection.

Outdoor Preparations

  1. Landscaping: Trim back shrubs, bushes, and tree branches within three feet of window openings to provide safe ladder access and prevent frame scratches.
  2. Clear Paths: Move vehicles, bicycles, toys, and patio furniture away from the driveway and walkways to allow for delivery trucks and material transport.
  3. Property Access: Ensure all gates are unlocked so the crew can reach the backyard.

General Logistics

  • Pet and Child Safety: Arrange for pets to stay in a secure room away from the work zone and keep young children at a safe distance.
  • Communication: Provide a reliable contact number and alert all household members to the arrival time and expected noise levels.

Related FAQs