To ensure a smooth and efficient project, home preparation should begin 1 to 2 days before the crew arrives. Preparation is divided into indoor and outdoor tasks:
Indoor Preparations
- Clear Access: Move all furniture, including couches, tables, and chairs, at least three feet away from every window being replaced.
- Remove Window Treatments: Take down all curtains, drapes, blinds, and valances. These should be stored in a separate room or closet until the project is finished.
- Clear Sills and Surfaces: Remove picture frames, potted plants, lamps, and fragile decorations from window sills. Secure small valuables in a safe location.
- Protect Flooring: While contractors typically provide heavy-duty drop cloths, notify them in advance if you have antique rugs or delicate flooring that requires extra protection.
Outdoor Preparations
- Landscaping: Trim back shrubs, bushes, and tree branches within three feet of window openings to provide safe ladder access and prevent frame scratches.
- Clear Paths: Move vehicles, bicycles, toys, and patio furniture away from the driveway and walkways to allow for delivery trucks and material transport.
- Property Access: Ensure all gates are unlocked so the crew can reach the backyard.
General Logistics
- Pet and Child Safety: Arrange for pets to stay in a secure room away from the work zone and keep young children at a safe distance.
- Communication: Provide a reliable contact number and alert all household members to the arrival time and expected noise levels.
Related FAQs
-
What are Denver’s Zoning Laws for Accessory Dwelling Units in 2026?
Read More »: What are Denver’s Zoning Laws for Accessory Dwelling Units in 2026?In 2026, Denver’s zoning laws for Accessory Dwelling Units (ADUs) require homeowners to adhere to specific dimensional and occupancy standards. The city generally allows ADUs in most residential zones (R-0 through R-4), provided the property meets the following criteria: Lot…
-
What is the Cost of Converting a Basement into an Adu in Denver?
Read More »: What is the Cost of Converting a Basement into an Adu in Denver?In Denver, the investment for converting a basement into an Accessory Dwelling Unit (ADU) typically ranges from $40,000 to $80,000. This is currently the most popular ADU conversion option in the Denver market. Several factors influence the final cost of…
-
How Much should a 2,000 Sq Ft Home Remodel Cost in Denver?
Read More »: How Much should a 2,000 Sq Ft Home Remodel Cost in Denver?For a 2,000-square-foot home in the Denver metro area, the cost of a whole-house remodel typically ranges based on the scope of work and quality of finishes: Standard Remodels: These generally range from $150 to $300 per square foot, placing…
-
What Factors Affect the per Square Foot Cost of Home Remodeling?
Read More »: What Factors Affect the per Square Foot Cost of Home Remodeling?Several variables influence the per square foot cost of home remodeling, with projects in Colorado typically ranging from $150 to $300 for standard renovations and $350 to $600+ for luxury projects. The primary factors affecting these costs include: Scope of…
-
What is the Average Cost per Square Foot for a Whole House Remodel in 2026?
Read More »: What is the Average Cost per Square Foot for a Whole House Remodel in 2026?For 2026, the average cost per square foot for a whole house remodel in Colorado follows these general benchmarks based on industry research and local project data: Standard Projects: Typically range from $150 to $300 per square foot (though some…
