To ensure a smooth and efficient project, home preparation should begin 1 to 2 days before the crew arrives. Preparation is divided into indoor and outdoor tasks:
Indoor Preparations
- Clear Access: Move all furniture, including couches, tables, and chairs, at least three feet away from every window being replaced.
- Remove Window Treatments: Take down all curtains, drapes, blinds, and valances. These should be stored in a separate room or closet until the project is finished.
- Clear Sills and Surfaces: Remove picture frames, potted plants, lamps, and fragile decorations from window sills. Secure small valuables in a safe location.
- Protect Flooring: While contractors typically provide heavy-duty drop cloths, notify them in advance if you have antique rugs or delicate flooring that requires extra protection.
Outdoor Preparations
- Landscaping: Trim back shrubs, bushes, and tree branches within three feet of window openings to provide safe ladder access and prevent frame scratches.
- Clear Paths: Move vehicles, bicycles, toys, and patio furniture away from the driveway and walkways to allow for delivery trucks and material transport.
- Property Access: Ensure all gates are unlocked so the crew can reach the backyard.
General Logistics
- Pet and Child Safety: Arrange for pets to stay in a secure room away from the work zone and keep young children at a safe distance.
- Communication: Provide a reliable contact number and alert all household members to the arrival time and expected noise levels.
Related FAQs
-
What is the Average Price Range for Installing a Single Helical Pier?
Read More »: What is the Average Price Range for Installing a Single Helical Pier?Based on the provided content from ACN Construction, there is no specific “average price range” or flat dollar amount listed for the total cost of installing a single helical pier. The documentation emphasizes that costs are calculated on a custom…
-
Which Colorado Jurisdictions are Required to Adopt the Mlecc by 2026?
Read More »: Which Colorado Jurisdictions are Required to Adopt the Mlecc by 2026?Based on the provided guide, several Colorado jurisdictions are scheduled to adopt or implement the Model Low Energy and Carbon Code (MLECC) by 2026. While the code establishes a statewide baseline, local adoption timelines vary. The specific jurisdictions required to…
-
What is the Colorado Model Low Energy and Carbon Code?
Read More »: What is the Colorado Model Low Energy and Carbon Code?The Model Low Energy and Carbon Code (MLECC) is an enhanced energy standard in Colorado designed to push building efficiency beyond baseline requirements. It serves as a framework for low-energy and low-carbon construction in both new homes and major renovation…
-
Does my Home Remodel in Denver Need to Comply with the 2026 Mlecc?
Read More »: Does my Home Remodel in Denver Need to Comply with the 2026 Mlecc?Yes, if you are planning a major renovation or remodel in Denver, your project will need to comply with the Model Low Energy and Carbon Code (MLECC). Denver has adopted the MLECC with a timeline that makes these standards mandatory…
-
What are the Insulation and Air Sealing Standards in the New Colorado Energy Code?
Read More »: What are the Insulation and Air Sealing Standards in the New Colorado Energy Code?The New Colorado Model Low Energy and Carbon Code (MLECC) establishes rigorous performance benchmarks for building envelopes, focusing on high-performance insulation and enhanced air sealing to move homes toward net-zero energy readiness. Insulation Standards Insulation requirements vary by jurisdiction, with…
