To ensure a smooth and efficient project, home preparation should begin 1 to 2 days before the crew arrives. Preparation is divided into indoor and outdoor tasks:
Indoor Preparations
- Clear Access: Move all furniture, including couches, tables, and chairs, at least three feet away from every window being replaced.
- Remove Window Treatments: Take down all curtains, drapes, blinds, and valances. These should be stored in a separate room or closet until the project is finished.
- Clear Sills and Surfaces: Remove picture frames, potted plants, lamps, and fragile decorations from window sills. Secure small valuables in a safe location.
- Protect Flooring: While contractors typically provide heavy-duty drop cloths, notify them in advance if you have antique rugs or delicate flooring that requires extra protection.
Outdoor Preparations
- Landscaping: Trim back shrubs, bushes, and tree branches within three feet of window openings to provide safe ladder access and prevent frame scratches.
- Clear Paths: Move vehicles, bicycles, toys, and patio furniture away from the driveway and walkways to allow for delivery trucks and material transport.
- Property Access: Ensure all gates are unlocked so the crew can reach the backyard.
General Logistics
- Pet and Child Safety: Arrange for pets to stay in a secure room away from the work zone and keep young children at a safe distance.
- Communication: Provide a reliable contact number and alert all household members to the arrival time and expected noise levels.
Related FAQs
-
What are the Code Requirements for Historic Foundation Repairs?
Read More »: What are the Code Requirements for Historic Foundation Repairs?Restoring a historic foundation involves navigating a specialized set of regulations that balance modern structural safety with the preservation of your home’s original character. In Centennial and the wider Denver metro area, these projects must adhere to both current building…
-
How do I Handle Stone Foundation Mortar Deterioration in Old Buildings?
Read More »: How do I Handle Stone Foundation Mortar Deterioration in Old Buildings?To handle mortar deterioration in stone foundations, we follow a specialized process known as repointing, which is a critical component of historic foundation restoration. Because old stone foundations must be allowed to “breathe,” the repair method and materials used are…
-
What Questions should I Ask a Window Contractor before Hiring?
Read More »: What Questions should I Ask a Window Contractor before Hiring?To protect your investment and ensure a high-quality result, you should vet a window contractor thoroughly before signing any contract. Key questions to ask include: Related FAQs
-
How Long does a Full House Window Replacement Typically Take?
Read More »: How Long does a Full House Window Replacement Typically Take?The timeline for a full house window replacement involves several stages, with the actual installation typically occurring over several days depending on the size of the home. Project Stage Timelines Factors Influencing the Schedule While these are standard estimates, actual…
-
How should I Prepare my Home for Window Installation Day?
Read More »: How should I Prepare my Home for Window Installation Day?To ensure a smooth and efficient project, home preparation should begin 1 to 2 days before the crew arrives. Preparation is divided into indoor and outdoor tasks: Indoor Preparations Outdoor Preparations General Logistics Related FAQs