About us

The construction industry is experiencing a dynamic and transformative period of growth.

  • Home
  • FAQs
  • How Long does a Kitchen Remodel Take?
/
/
/
/
/
/
/
/
/

The duration of a kitchen remodel depends on the complexity and scope of the project. According to ACN Construction, homeowners should generally expect the following timeframes:

  • Standard Remodels: Typically take 4–8 weeks.
  • Complex Projects: Those involving structural changes can extend to 10–12 weeks.

Several factors can influence this timeline, including:

  • Permitting: Obtaining permits through the City of Centennial or Denver’s permitting office can add several weeks to the schedule (typically a 1–3 week review period).
  • Material Lead Times: Custom cabinetry often has lead times that may stretch 4–6 weeks beyond initial estimates.
  • Integrated Design-Build: Using a design-build approach helps keep timelines predictable by coordinating all phases—from initial concept drawings to final inspection—under one roof.
  • Inspections: The schedule must account for rough-in and final inspections to ensure code compliance, particularly before cabinet installation can begin.

Related FAQs