Yes, helical piles are generally more cost-effective than traditional concrete footings when the total project timeline and labor requirements are considered. While the initial material cost per unit may be higher for helical piles, they offer several strategic advantages that reduce the overall project budget and duration:
- Significant Time Savings: Helical piles can be installed in just 1–2 days and provide immediate load capacity. In contrast, concrete footings require several days for forming and pouring, plus a curing period of 7 to 28 days. Choosing helical piles typically reduces the total project duration by two to three weeks.
- Reduced Labor and Equipment: Helical piles require minimal digging and less soil disturbance. This eliminates the need for extensive excavation, spoil removal, and the subsequent site restoration often required with concrete footings.
- Performance in Poor Soil: In Centennial’s expansive clay soils, concrete footings may require expensive over-excavation and engineered fill. Helical piles can be torqued down to stable strata (often 15 to 25 feet deep) more efficiently, providing greater schedule certainty.
- Lower Quantity Requirements: Because helical piles are highly engineered, projects often require fewer total support points than traditional concrete methods, which helps offset the higher per-unit price.
Related FAQs
-
Can I Customize my Garage Door Style, Material, and Insulation During the Installation Process?
Read More »: Can I Customize my Garage Door Style, Material, and Insulation During the Installation Process?Yes, you can fully customize your garage door style, material, and insulation during the installation process. ACN Construction uses a design-build approach, which allows you to work with a single point of contact to select the specific features of your…
-
Are Egress Windows Required for a Basement Bedroom in Colorado?
Read More »: Are Egress Windows Required for a Basement Bedroom in Colorado?Yes, egress windows are mandatory for basement bedrooms in Colorado. According to the International Residential Code (IRC) and local Colorado building codes, every basement bedroom and habitable space must have an egress opening to serve as an emergency escape and…
-
How do I Apply for Home Improvement Loans for Energy-efficient Siding?
Read More »: How do I Apply for Home Improvement Loans for Energy-efficient Siding?To apply for home improvement loans for energy-efficient siding in Colorado, you can follow a structured five-step process designed to help you secure the best rates and utilize available incentives: Define your project scope and estimate costs. Begin by determining…
-
How can I Tell if the Helical Pier Cost I was Quoted Includes a ‘no Depth Clause’?
Read More »: How can I Tell if the Helical Pier Cost I was Quoted Includes a ‘no Depth Clause’?To determine if your quote includes a no depth clause (or conversely, contains a clause that allows for price adjustments), you should carefully review the contract language regarding soil conditions and pier depth. Based on industry standards and ACN Construction’s…
-
Why do Contractors Often Charge per Pier Location Rather than Just for Materials?
Read More »: Why do Contractors Often Charge per Pier Location Rather than Just for Materials?Contractors utilize a per-pier location pricing model because it accurately reflects the specific labor, equipment, and engineering required at every individual support point. This method is considered an industry-best practice for several reasons: Independent Labor Requirements: Each pier location requires…
