While property owners often confuse the two, a Perc Test and a Geotechnical Report serve entirely different purposes and cannot be used interchangeably for structural work.
### Perc Test (Percolation Test)
- Primary Purpose: Used solely for septic system design.
- Key Data: It measures the soil’s absorption rate in minutes per inch to determine the size of a leach field.
- Structural Relevance: It provides no data on whether soil can support a building. Building departments will not accept a perc test for foundation permits.
- Typical Cost: $100 – $300 per test hole.
### Geotechnical Report
- Primary Purpose: Evaluates soil bearing capacity for structural foundation design and repair.
- Key Data: Provides comprehensive technical details including soil type classification, density, groundwater depth, shear strength, and shrink/swell potential.
- Structural Relevance: Essential for calculating foundation dimensions and determining the depth and spacing of helical piers.
- Typical Cost: $800 – $3,500 depending on the project scope and site access.
In the Denver metro area, geotechnical reports must be prepared by a licensed geotechnical engineer and follow ASTM standards to ensure the long-term stability of the structure.
Related FAQs
-
What Factors Cause Helical Pier Installation to be More Expensive than Push Piers?
Read More »: What Factors Cause Helical Pier Installation to be More Expensive than Push Piers?Based on the provided content, helical pier installation can be more expensive than push piers due to several specific factors regarding materials, manufacturing, and specialized requirements: Manufacturing Complexity: Helical piers have a higher per-unit cost because the fabrication process is…
-
How does the Structure’s Weight Impact the Cost Difference between Push and Helical Piers?
Read More »: How does the Structure’s Weight Impact the Cost Difference between Push and Helical Piers?The weight of a structure significantly impacts the choice and cost of a piering system because different systems are engineered for specific load capacities. Generally, the heavier the structure, the more likely push piers will be required, despite their higher…
-
What Factors besides Material Costs Influence the Price per Helical Pier?
Read More »: What Factors besides Material Costs Influence the Price per Helical Pier?While material costs are a significant factor, the total price per helical pier is influenced by several logistical, environmental, and technical variables. Beyond the steel itself, the following factors determine the final cost: Soil Conditions: The type of soil (such…
-
Are There Additional Fees for Permits and Engineering Included in the Cost per Helical Pier?
Read More »: Are There Additional Fees for Permits and Engineering Included in the Cost per Helical Pier?In most cases, permits and engineering fees are not bundled into the base material and labor cost per pier. Instead, they are treated as separate line items. According to ACN Construction, it is important to understand how these costs are…
-
How does the Expense of Installing Helical Piers Compare to Other Foundation Repair Methods?
Read More »: How does the Expense of Installing Helical Piers Compare to Other Foundation Repair Methods?When evaluating foundation repair, helical piers typically have a higher upfront cost per unit compared to other methods, but they offer specific performance and installation advantages. The cost for helical piers generally ranges from $2,000 to $5,000 per pier. Here…
