Yes, there are several additional costs associated with helical pier installation that may not be included in the base price per pier. While a standard quote from ACN Construction typically covers materials, professional installation, and basic load testing, other site-specific requirements are often billed separately.
Key additional costs include:
- Soil Analysis and Geotechnical Reports: A formal investigation is required to determine soil bearing capacity and the necessary pier depth. This is a critical upfront cost as poor soil can demand longer or larger-diameter piers.
- Engineering and Permits: Costs for stamped engineering reports and municipal building permits (such as those required by the City of Centennial) are generally separate line items.
- Site Accessibility Adjustments: If a site has limited access—such as tight crawl spaces, narrow yards, or steep landscaping—labor costs may increase by 10–20% due to the need for manual handling or specialized compact equipment.
- Depth Variations: While a base price is provided, every additional foot of depth needed to reach stable soil typically adds $30–$50 per pier in material and labor costs.
- Specialized Hardware: Items like specialized underpinning brackets or larger helix plates for difficult soil conditions may incur extra charges.
- Mobilization Fees: This covers the cost of delivering equipment and moving the crew to your specific property.
Related FAQs
-
What is the Relationship between Installation Torque and Soil Bearing Capacity?
Read More »: What is the Relationship between Installation Torque and Soil Bearing Capacity?The relationship between installation torque and soil bearing capacity is governed by an empirical correlation that allows us to estimate the ultimate load-bearing strength of a pier based on the rotational force required to install it. This is expressed through…
-
How is the Soil Bearing Capacity Determined for Helical Pier Installation?
Read More »: How is the Soil Bearing Capacity Determined for Helical Pier Installation?To determine soil bearing capacity for helical pier installation, we use a multi-layered approach that combines theoretical engineering, real-time field measurements, and specialized testing. Our process ensures that structural loads are transferred past weak surface soils—such as the expansive clay…
-
Why is a Geotechnical Investigation Necessary to Verify Soil Bearing Capacity?
Read More »: Why is a Geotechnical Investigation Necessary to Verify Soil Bearing Capacity?A geotechnical investigation is essential because it provides the foundational data required to design a safe and reliable helical pier system. Soil properties vary significantly, and understanding the specific conditions at your site—such as soil stratigraphy, groundwater levels, and the…
-
What are the Best Stabilization Methods for 100-year-old Foundations?
Read More »: What are the Best Stabilization Methods for 100-year-old Foundations?Stabilizing a 100-year-old foundation requires a specialized approach that balances modern engineering with the preservation of historic materials. We utilize several proven methods to address the unique challenges of aging masonry and expansive soil conditions. Because every historic property is…
-
Can Helical Piers be Used for Historic Building Restoration?
Read More »: Can Helical Piers be Used for Historic Building Restoration?Yes, helical pier stabilization is an ideal solution for historic foundation restoration. Unlike traditional excavation methods, helical piers—also known as screw piles—are screwed into stable load-bearing soil deep beneath the active movement zone with minimal vibration and disruption to the…
